PRODUCTION WORLDFACTORY DAY v3.1.0
For the clearest comparison on iPad, rotate to landscape and enter full screen.

ONE SHIFT. EVERY HANDOFF.

Let the work speak.

Follow the people, inspect the decisions, see what ships.

Local simulation 08:00Order & engineering release

Loading the operational layout…

MachiningOperator serviceAvailable / waitingInterlockNumbered personnel = individual resources
00:00 / 07:00Six chapters × 70 seconds · 08:00–16:00 shift

SAME ORDER · SAME CLOCK · SAME COST INPUTS

Baseline vs improved

As of 08:00

Both runs follow this playback clock. Delta = improved − baseline. Green means a favorable change; lower cost, walking and waiting are favorable. Margin differences are percentage points.

MetricBaselineImprovedDifference

GIVE THE TEAM A BRIEF

Supported: “Produce N units”. Applies a quantity; release and capacity constraints still apply.

Operating inputs & monthly targets

Costs use the selected factory currency. Capacity and financial values are planning inputs, available for factory calibration.

DELIVERY & BUSINESS

Shift-close forecast · 16:00

Final results below are a forecast of the complete shift. The synchronized comparison above follows the current playback time.

Inspect formulas

Revenue = shipped × selling price. Production cost = material started + full-shift staffing + machine running cost. Accepted-unit cost = production cost ÷ accepted units. COGS = shipped × accepted-unit cost. Gross margin = (revenue − COGS) ÷ revenue. Buffer remains inventory, never revenue. Unfinished work is conservatively expensed in this planning model.

Monthly projection = this shift's revenue × working days; attainment = projection ÷ monthly revenue target. A projection is separate from actual booked sales.

LOCAL ↔ CLOUD

Inspect the handoff

Browser: simulation, playback and saved parameters. Server: validates inputs and independently recalculates the same model on POST. No CNC, ERP or factory device is connected.

Not sent. Your run stays in this browser until you submit it.

No server receipt yet.

Only factory key, scenario, method and numeric inputs are sent to the shared be-passive Worker. No drawings or personal records. The calculation endpoint does not persist runs; the receipt is saved locally and included in export.

TRACEABLE EXECUTION

Event log

Engineering evidence, calibration & version scope

This executable model separates manual work, walking and automatic machine time. Geometry and unconfirmed equipment/staffing remain editable model assumptions, not surveyed factory drawings. Tea and personal-phone time represent available or break time, not observations of named employees.

To certify a 1:1 replica: supply a scaled floorplan; machine and PC inventory; anonymized role/shift roster; paths and observed cycle times; engineering routing and revision rules; costs and monthly KPI targets. Validate these against a recorded shift. Current improvement values are computed scenario comparisons, not measured factory savings.

v3.1.0: executable shift model, six-chapter playback, individual resources, baseline comparison, local save/export and server replay. Earlier versions remain available at their version URLs.