Supported: “Produce N units”. Applies a quantity; release and capacity constraints still apply.
Operating inputs & monthly targets
Costs use the selected factory currency. Capacity and financial values are planning inputs, available for factory calibration.
DELIVERY & BUSINESS
End-of-shift outcome
Inspect formulas
Revenue = shipped × selling price. Production cost = material started + full-shift staffing + machine running cost. Accepted-unit cost = production cost ÷ accepted units. COGS = shipped × accepted-unit cost. Gross margin = (revenue − COGS) ÷ revenue. Buffer remains inventory, never revenue. Unfinished work is conservatively expensed in this planning model.
Monthly projection = this shift's revenue × working days; attainment = projection ÷ monthly revenue target. A projection is separate from actual booked sales.
LOCAL ↔ CLOUD
Inspect the handoff
Browser: simulation, playback and saved parameters. Server: validates inputs and independently recalculates the same model on POST. No CNC, ERP or factory device is connected.
Not sent. Your run stays in this browser until you submit it.
No server receipt yet.
Only factory key, scenario, method and numeric inputs are sent to the shared be-passive Worker. No drawings or personal records. The calculation endpoint does not persist runs; the receipt is saved locally and included in export.
TRACEABLE EXECUTION
Event log
Engineering evidence, calibration & version scope
This executable model separates manual work, walking and automatic machine time. Geometry and unconfirmed equipment/staffing remain editable model assumptions, not surveyed factory drawings. Tea and personal-phone time represent available or break time, not observations of named employees.
MOBIO: UMIX — press-die design and manufacturing; does not establish current floorplan or staffing.
To certify a 1:1 replica: supply a scaled floorplan; machine and PC inventory; anonymized role/shift roster; paths and observed cycle times; engineering routing and revision rules; costs and monthly KPI targets. Validate these against a recorded shift. Current improvement values are computed scenario comparisons, not measured factory savings.
v3.0.0: executable shift model, six-chapter playback, individual resources, baseline comparison, local save/export and server replay. Earlier versions remain available at their version URLs.