From commitment to delivery
Invite customers to explore your production line. Every order depends on engineering preparation, machines, people and processes working together. Scroll down to explore the connections.
50 machining centers5 / 10 Orders and batch sizeAll operations Capability comparison
Open the three factory workspaces Continue 3D Production journey
Interactive process illustrations, not scans of the three factories. Quantities follow the supplied observations; equipment appearance, layout and die geometry are illustrative.
Sanxie model · Prepare engineering first
Five machines per group, every group has an owner. 50 machining centers, with each operator tending 5 machines each, calculated shift staffing is 10 direct tending positions.
Select a machine to see its group. Programming, setup, first-article, quality and maintenance support are tracked separately.
No machine selected. You can also use the menu below.
View machine Take an order on this line
Sanxie model · How incidents are handled
Deviation detected, Quarantine first. Release with evidence. On M17 , trigger a sample incident and check the machines and work-in-progress requiring attention.
Trigger M17 Dimensional deviation Engineering correction and retest Quality status: no active demonstration incident.
This action simulates detection of → Responsibility allocation → Retest → release; it does not control real equipment.
Fixture model · Order five, prepare ten
One machining batch, Two different destinations. After common operations on ten parts, five proceed to delivery and five remain as semi-finished stock for future demand.
View batch routing Common operations · 10 parts per batch Current order 5 parts Prepare semi-finished stock 5 parts
Move the slider to view routing. Spatial movement illustrates the split, not actual machine or logistics motion.
Compare the next order with and without buffered stock
Turn visibility into verifiable trust
Now, Take ownership of an order. Enter the scene and make decisions: when can engineering data be released, who owns an incident, and which semi-finished parts are usable?
Next, enter the interactive Demo Decisions, quality gates, customer view, replay and export.
Start order exercise Record measured before/after labor time v2.4.0 Adds a scroll-driven 3D experience; v2.4.0 Actions Demo and v2.1.0 production models are retained.Made by Metaverse Digital Creative.